Against the Clock: How Dalkia and Smardt Restored Critical Cooling Over a Weekend

Manhattan, New York, USA

When the only chiller serving an Empire State Realty property went down on a Friday morning, there was little room for error—and even less time.

 

With a critical replacement CPU located hundreds of miles away and no standard weekend process for accessing it, Smardt and Dalkia U.S. Chillers mobilized across teams, locations and the weekend to find a solution.

 

Through technical expertise, rapid coordination and a remarkable commitment to the customer, the replacement part reached Manhattan Sunday evening, and the chiller was back in operation before the start of the Monday business day.

Challenge

The situation began around 7:30 Friday morning when the Smardt chiller serving the Empire State Realty property unexpectedly shut down. For building management, the situation was particularly urgent: this was the property’s only chiller.

 

Dalkia U.S. Chillers immediately dispatched a technician to investigate. A second technician joined the effort as troubleshooting continued, but the team was unable to restart the chiller.

 

With the HMI displaying an abnormal screen, Dalkia engaged Smardt Technical Support to help determine whether the problem was related to the display, controller or CPU.

 

After working through the possibilities, the teams identified a failed CPU/controller as the likely cause. The technical problem had been isolated. Now they had to solve a different problem: getting the replacement part to the site.

 

The replacement CPU was confirmed to be available in Smardt inventory at the Plattsburgh facility. But with Friday evening approaching and the weekend beginning, accessing the facility and transporting the part to Manhattan presented a significant logistical challenge.

 

The clock was now working against everyone.

Client
Empire State Realty
Location
Manhattan, New York, USA
Industry
Commercial Real Estate
Application
Commercial Building Cooling
Product
Smardt Chiller (model and capacity not specified)
Sales Partner
Dalkia U.S. Chillers

Solution

Rather than allowing the weekend to become a barrier, the Smardt and Dalkia teams began working together on a recovery plan.

 

Throughout Friday evening and Saturday, the teams coordinated across organizations and locations to confirm the part, arrange access to the facility and determine the fastest way to get it into the hands of the technician.

 

There was no established after-hours process that could simply be activated. The solution had to be created in real time.

By Sunday morning, the recovery plan was in motion. Access to the Plattsburgh facility was arranged and the replacement CPU was physically located and secured. Dalkia then arranged for the part to be transported by air to the New York area.

 

The handoff took place Sunday evening. From there, the part was transported directly to the Empire State Realty property, where a Smardt service technician was already prepared to begin the repair.

 

The replacement controller was installed and programmed that evening. Within hours, three of the four compressors were operating again.

 

The remaining compressor issue was resolved Monday morning, bringing the chiller fully back online, with only a separate BMS issue remaining to be addressed.

 

From a Friday morning failure to a Sunday evening recovery, the teams remained focused on one objective: restoring the customer’s cooling before Monday.

Benefits

For Empire State Realty, the most important result was simple: the chiller was operational for the start of the next business day.


What could have developed into a prolonged weekend outage was resolved through the combined technical expertise, responsiveness and resourcefulness of the Dalkia and Smardt teams. The response gave the customer a clear recovery plan when the situation was uncertain and delivered a working solution when time mattered most.


The experience also reinforced the value of the relationship between Dalkia and Smardt. Empire State Realty is an important account, with multiple Smardt chillers already installed across its properties and additional opportunities ahead.


In a situation where customer confidence could easily have been tested, both organizations demonstrated their willingness to go beyond normal operating hours and responsibilities to protect the customer’s operation.


The weekend response also highlighted an important opportunity for Smardt: turning exceptional individual effort into a repeatable service capability.


“I can’t stress enough how critical it was to have that chiller operational on Sunday. This wasn’t just about fixing a piece of equipment. It was about protecting our customer’s operation and our relationship with them.”

— Joe Taormina, General Manager, Dalkia U.S. Chiller Services

The experience reinforced the need for stronger regional critical-parts availability and defined after-hours parts access, helping ensure that future customers can benefit from the same level of responsiveness without relying on an ad hoc process.


Ultimately, the incident demonstrated what can happen when a customer challenge becomes a shared priority.

When every hour matters, strong partnerships,
technical expertise and a determination to find a
way forward can make all the difference.

Rapid Replacement for Data Center Cooling

Set in one of the most data-intensive regions in the U.S., this project involved delivering two high-efficiency chillers to a mission-critical data center in the NY region. The facility operates 24/7, housing critical IT infrastructure that demands precise, reliable cooling under varying load and weather conditions. 

Read More

Rush University Medical Center

Founded in 1837, Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital with multi-story buildings that dominate the city’s medical district.

Read More

Share this Case Study

Related Case studies

Rapid Replacement for Data Center Cooling

Set in one of the most data-intensive regions in the U.S., this project involved delivering two high-efficiency chillers to a mission-critical data center in the NY region. The facility operates 24/7, housing critical IT infrastructure that demands precise, reliable cooling under varying load and weather conditions. 
View Case Study

Powering Industrial Decarbonization with the World’s Largest Oil-Free Magnetic Bearing Chillers

Eastman Business Park (EBP), located in Rochester, New York is a 1,200-acre R&D and manufacturing campus with over 16 million square feet of multi-scale manufacturing, distribution, lab and office space.
View Case Study

Museum of New Zealand Te Papa Tongarewa

Situated on the Wellington Waterfront, the Museum of New Zealand Te Papa Tongarewa is a major icon in the capital city.
View Case Study