West Nippissing General Hospital

Nippissing, Ontario

West Nippissing General Hospital currently had a single 150 ton low pressure water-cooled chiller from a competing manufacturer. 

Later, a second air-cooled chiller was installed outside the kitchen area to provide added capacity and a backup system.

The challenge

The main issue was that the water-cooled chiller was more than 30 years old, putting it past the normal expected lifespan for a chiller of this size. It had become unreliable and expensive to maintain. The water-cooled chiller had lost capacity through plugged tubes, scale build-up, and problems with the cooling tower. This drove up energy costs, as the chiller had to work harder, it decreased building cooling capacity, and it caused the outside chiller to be run more often to pick up the slack. Also, the government was pushing to have the refrigerant used in the existing chiller phased out over the next few years, which meant that the existing chiller would have to be either converted to run on approved refrigerant or replaced.

Client
West Nippissing General Hospital
Location
Nippissing, Ontario
Industry
Heathcare
Application
Hospital
Product
Water-cooled, 270 ton
3×90 ton compressors

The solution

After review of all available options, a consultancy firm recommended the SMARDT chillers. The overall life cycle cost savings were greatest with the SMARDT chillers when considering energy costs, repair costs, and maintenance costs over the life of the chiller. Although the initial cost of a manufacturer new chiller was lower than the SMARDT chiller, there were going to be additional costs to take apart the screw chiller to get into the site. 

Conclusion

The SMARDT modular chiller design allowed the chillers to be brought in without major disassembly taking place on site, the new chiller is also quieter, produces less vibration than the old unit, energy efficiency has been enhanced, and cost savings achieved.

Share this Case Study

Want to rent Smardt chillers?

Contact a specialist to learn more about our rental services. 

Talk to an expert to find out which product is right for you, and how much you can save.

Related Case studies

Museum of New Zealand Te Papa Tongarewa

Situated on the Wellington Waterfront, the Museum of New Zealand Te Papa Tongarewa is a major
View Case Study

Rush University Medical Center

Founded in 1837, Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital with multi-story buildings
View Case Study

Queen Elizabeth Building

The Board of Governors of Exhibition Place needed to replace the existing mechanical systems in the
View Case Study

Product Support

Support in Canada

Telephone +1 514 426 8989
Email @smardt.com

Support in US

Telephone +1 
Email @smardt.com

Support in Europe

Telephone +

Email  @smardt.com

Support in SE Asia

Telephone +
Email @smardt.com

Support in China

Telephone +
Email  @smardt.com

Support in Australia

Telephone +
Email @smardt.com