University of La Verne

La Verne, California

Access and installation inside a tight space were key factors that could not be isolated from the main fac-tors of energy efficiency and least maintenance.

The project was driven by utility rebates and lowest total cost of ownership for the University. Certainly there are chillers that provide lower capital cost, but they inherently cost much more to operate and maintain. Access — SMARDT was able to provide industry best energy efficiency in a low profile design. The chiller was shipped in a “knocked -down” state, with separate skids for each heat exchanger, the compressors and electrical panel assembly.

Client
Unversity of La Verne
Location
La Verne, California
Industry
Education / Medical
Application
University
Product
Water-cooled
2×150 ton

The challenge

There were other competitive VFD chillers considered that had very good energy efficiency values when brand new, but when other factors such as limitations on reducing head pressure and the presence of oil that affects annual and long term cost of ownership, and the insulating effect of oil on heat exchanger surfaces, demonstrated that long term IPLV values could not be maintained and operational costs would certainly be higher.

Additionally, the patented SMARDT adaptive logic compressor staging system that works on power relation-ships and not on traditional bypass of percent demand, demonstrated savings beyond IPLV. Energy efficiency was also enhanced by our ability to provide a threepass evaporator and a two pass condenser.

The solution

Maintenance and Reliability – Annual maintenance was reduced to tube-cleaning, periodic electrical checks and ten-year capacitor replacements. There are no bearings to inspect every 8-10 years and no expensive compressor rebuild cycle. A reduced expense service contract was required. Because of the oil-free design and DC drive system, the occurrence of acid formation common to lubricated AC drive systems is eliminated, enabling compressors on one circuit and without the risk associated with traditional chillers.

Conclusion

University of Laverne team was happy as Smardt was able to provide industry best energy efficiency in a low profile design. This greatly reduced rigging costs and provided the low height chiller to be installed in the equipment room and not have to reroute existing piping. Also, SMARDT was the only manufacturer with the flexibility to provide custom originated connections.

Share this Case Study

Want to rent Smardt chillers?

Contact a specialist to learn more about our rental services. 

Talk to an expert to find out which product is right for you, and how much you can save.

Related Case studies

Museum of New Zealand Te Papa Tongarewa

Situated on the Wellington Waterfront, the Museum of New Zealand Te Papa Tongarewa is a major
View Case Study

Rush University Medical Center

Founded in 1837, Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital with multi-story buildings
View Case Study

West Nippissing General Hospital

West Nippissing General Hospital currently had a single 150 ton low pressure water-cooled chiller from a
View Case Study

Product Support

Support in Canada

Telephone +1 514 426 8989
Email @smardt.com

Support in US

Telephone +1 
Email @smardt.com

Support in Europe

Telephone +

Email  @smardt.com

Support in SE Asia

Telephone +
Email @smardt.com

Support in China

Telephone +
Email  @smardt.com

Support in Australia

Telephone +
Email @smardt.com