Animal Service Center

Southern California

California passed a law that prevents euthanizing stray animals detained by Animal Control services. Therefore, they must be housed and fed until a suit-able home can be found.

This facility provides both veterinarian health care, indoor housing and a large exercise yard for animals. Because the law requires the animals to be housed indoors, the cost of providing reliable air con-ditioning at the lowest possible cost of energy and maintenance was mandatory.

Energy savings 

SMARDT was able to demonstrate a full load efficiency of 1.07 kw/ton and a best-in-class IPLV of .67 kW/ton in an oil-free design.

Client
Animal Service Center
Location
Southern California
Industry
Veterinary
Application
Veterinarian Housing
Product
Air-cooled
170 tons

Annual Maintenance

Was reduced to periodic electrical checks and ten-year capacitor replacements. There are no bearings to inspect every 8-10 years and no expensive compressor rebuild cycle.

Reliability

The facility houses live animals and therefore equipment reliability was a key success factor. The chiller is capable of producing up to 170 tons, but the actual load was only 125 tons. This provides both better capacity redundancy and superior performance at the reduced load.

Noise

SMARDT air cooled chillers provide the lowest noise of any alternative. The chiller was installed in a semi-enclosed area to reduce noise and eliminate audibly disruptive fan cycling common with traditional designs. With noise levels of 70 dBa for compressors and variable-speed reduced noise fans, the result was audible noise levels that were superior to customer expectations.

Conclusion

SMARDT was the natural choice with its unique line of air-cooled chillers with industry best energy efficiencies, low sound levels, and oil-free designs, that equate to lowest maintenance costs and total cost of ownership. 

Share this Case Study

Want to learn more on our Smardt chillers?

Contact a specialist today.

Talk to an expert to find out which product is right for you, and how much you can save.

Related Case studies

Rapid Replacement for Data Center Cooling

Set in one of the most data-intensive regions in the U.S., this project involved delivering two high-efficiency chillers to a mission-critical data center in the NY region. The facility operates 24/7, housing critical IT infrastructure that demands precise, reliable cooling under varying load and weather conditions. 
View Case Study

Museum of New Zealand Te Papa Tongarewa

Situated on the Wellington Waterfront, the Museum of New Zealand Te Papa Tongarewa is a major icon in the capital city.
View Case Study

Rush University Medical Center

Founded in 1837, Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital with multi-story buildings that dominate the city’s medical district.
View Case Study