Skip to content

Hôpital Louis H. Lafontaine

Montreal, Québec

Hôpital Louis-H. Lafontaine, located in Montréal, did not have an existing cooling system in the building. 

The hospital was involved in the first phase of reorganizing and renovating existing space in order to convert it into office space. During the first phase of the project, only 20% of the total available space (four out of eighteen blocks) was being renovated, which amounted to approximately 18,000 square feet of office space. The current cooling load was 30 tons.

As the project progressed into additional phases, more office space would become available, and a greater cooling load would be required. The mechanical consultant initially specified a new 170 ton water-cooled screw York chiller as a solution for the hospital’s cooling requirements. Direct Energy’s sales representatives met with the hospital’s Technical Management team to discuss the benefits of installing a SMARDT chiller.

Client
Hôpital Louis H. Lafontainer
Location
Montreal, Québec
Industry
Healthcare
Application
Hospital
Product
Water-cooled
170 ton

Solution

Upon evaluation of the information and technical data, the hospital’s technical management team requested the installation of a 170 ton SMARDT chiller, which included two 85 ton compressors. This solution ensured that there would be sufficient capacity for future needs. It also takes full advantage of energy savings, as the SMARDT chiller is more energy efficient than other types of chillers. Additional benefits include lower maintenance costs, ability to operate at low load, low noise levels, and oil-free operation.

Conclusion

Since the installation, the hospital’s technical management team and staff have been extremely satisfied with the performance of the SMARDT chiller. The primary benefit at this stage has been the chiller’s ability to operate at a very low load (20% of its capacity, or 17 tons). Since the project is partially completed, the chiller has been operating at temporary low load, and has even had multiple starts and stops without issue. This has made it possible to operate the chiller effectively throughout the summer.

Share this Case Study

Want to rent Smardt chillers?

Contact a specialist to learn more about our rental services. 

Talk to an expert to find out which product is right for you, and how much you can save.

Related Case studies

Museum of New Zealand Te Papa Tongarewa

Situated on the Wellington Waterfront, the Museum of New Zealand Te Papa Tongarewa is a major
View Case Study

Rush University Medical Center

Founded in 1837, Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital with multi-story buildings
View Case Study

West Nippissing General Hospital

West Nippissing General Hospital currently had a single 150 ton low pressure water-cooled chiller from a
View Case Study

Product Support

Support in Canada

Telephone +1 514 426 8989
Email @smardt.com

Support in US

Telephone +1 
Email @smardt.com

Support in Europe

Telephone +

Email  @smardt.com

Support in SE Asia

Telephone +
Email @smardt.com

Support in China

Telephone +
Email  @smardt.com

Support in Australia

Telephone +
Email @smardt.com