Études de cas
Découvrez comment notre technologie innovante sans huile améliore l'efficacité des refroidisseurs, aide à répondre aux initiatives écologiques et offre un remboursement rapide à nos clients.
Walnut Creek
The replacement of an older less energy efficient chiller at Urban West Business Park building in Walnut Creek, California, with an efficient energy saving SMARDT chiller, has brought impressive energy savings for this customer.
Université de La Verne
L’accès et l’installation à l’intérieur d’un espace étroit étaient des facteurs clés à considérer en plus
Siège social de NFL Films
When the building owner is NFL Films, the failure of the HVAC system can cause a lot more than discomfort — it can be catastrophic.
Centre de services aux animaux
Because the law requires the animals to be housed indoors, the cost of providing reliable air con-ditioning at the lowest possible cost of energy and maintenance was mandatory.
Hôpital Arnprior & District Memorial
Arnprior & District Memorial Hospital in Ontario, had been working with the Ministry of Health for several years to replace their existing chiller.
RED Rochester
Eastman Business Park (EBP), located in Rochester, New York is a 1,200-acre R&D and manufacturing campus with over 16 million square feet of multi-scale manufacturing, distribution, lab and office space.
Parc médical universitaire
Affiliated with the Carolinas Medical Center, it is located adjacent to The University Hospital at the intersection of North Tryon Street and WT Harris Boulevard, in Charlotte, North Carolina.
Hôpital Maisonneuve-Rosemont
Hôpital Louis-H. Lafontaine, located in Montreal, did not have an existing cooling system in the building. The hospital was involved in the first phase of reorganizing and renovating existing space in order to convert it into office space.
Hôtel-Dieu D’Arthabaska
The existing chiller plant at the Hôtel-Dieu D’Arthabaska was more than 30 years old. It consisted of a single 120 ton low pressure chiller. It was serving a number of air handling units and departments, including magnetic resonance imaging, radiology, pediatric, and the kitchen.
Édifice Queen Elizabeth
The Board of Governors of Exhibition Place needed to replace the existing mechanical systems in the Queen Elizabeth Building at Exhibition Place, Toronto. This goal was to be achieved at the lowest feasible cost.
Hôpital général de West Nippissing
West Nippissing General Hospital currently had a single 150 ton low pressure water-cooled chiller from a competing manufacturer. Later, a second air-cooled chiller was installed outside the kitchen area to provide added capacity and a backup system.
CHU (Centre Hospitalier Universitaire) Rush
Founded in 1837, Rush University Medical Center (RUMC) is now Chicago’s second-largest hospital with multi-story buildings that dominate the city’s medical district.
Vous souhaitez en savoir plus sur nos refroidisseurs Smardt ?
Contactez un spécialiste dès aujourd’hui.